PENGUKURAN KELELAHAN KERJA DAN EVALUASI POSTUR KERJA PADA PEKERJA PELONGGARAN GARAM

Authors

  • Moh. Subhan Basri Prodi Teknik Industri, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya
  • Handy Febri Satoto Prodi Teknik Industri, Fakultas Teknik, Universitas 17 Agustus 1945 Surabaya

DOI:

https://doi.org/10.31949/jensitec.v10i02.9287

Abstract

This study aims to measure the physical workload experienced by workers in Pegaraman 1 Sumenep, PT Garam (Persero). With a production of 115,000 tons per season, Pegaraman Area 1 Sumenep faces a huge challenge in achieving production targets with the use of efficient tools for workers. This is the problem that causes work fatigue, based on the identification of the research conducted. To overcome this problem, the research will focus on measuring the physical workload of salt loosening workers using the NBM, REBA, and CVL methods, in the hope of finding the right solution to solve problems related to work fatigue during the salt loosening process. The results showed that workers experienced physical workloads that needed action, with the results of the NBM recapitulation with a value of 50–70 risk levels, the REBA score with a value of 4, and CVL percentage values of 54.53% for the first worker, 55.21% for the second worker, and 53.67% for the third worker. Based on these findings, it can be concluded that the use of simple tools causes fatigue in workers. Therefore, an innovation is needed in the design of salt loosening tools to reduce the risk of fatigue in workers.

Keywords:

Work fatigue, NBM, REBA, CVL, PT. GARAM., work

Downloads

Download data is not yet available.

References

C. I. M.H.P Aulia, “Akan Larang Impor Garam, Indonesia Siap Penuhi Kebutuhan?,” www.cnbcindonesia.com.

M. Zulfiqar and A. Rizqiansyah, “HUBUNGAN ANTARA BEBAN KERJA FISIK DAN BEBAN KERJA MENTAL BERBASIS ERGONOMI TERHADAP TINGKAT KEJENUHAN KERJA PADA KARYAWAN PT JASA MARGA (PERSERO) Tbk CABANG SURABAYA GEMPOL,” 2017.

R. Maharaja, “ANAlISIS TINGKAT KElElAHAN KERJA BERDASARKAN BEBAN KERJA FISIK PERAWAT DI INSTAlASI RAWAT INAP RSU HAJI SURABAYA,” The Indonesian Journal of Occupational Safety and Health, vol. 4, pp. 93–102, 2015.

A. Syawaludin and H. F. Satoto, “ANALISIS BEBAN KERJA FISIK DAN MENTAL PADA PEKERJA UD. NURAJI POT,” JUSTI (Jurnal Sistem dan Teknik Industri), vol. 3, no. 4, p. 503, 2022.

Tamala A, “PENGUKURAN KELUHAN MUSCULOSKELETAL DISORDERS (MSDS) PADA PEKERJA PENGOLAH IKAN MENGGUNAKAN NORDIC BODY MAP (NBM) DAN RAPID UPPER LIMB ASSESSMENT (RULA),” Jurnal TIN Universitas Tanjungpura, vol. 4.2, 2020.

J. Sosial, H. Terapan, and N. F. Dewi, “IDENTIFIKASI RISIKO ERGONOMI DENGAN METODE NORDIC BODY MAP TERHADAP PERAWAT POLI RS X,” Jurnal Sosial Humaniora Terapan, vol. 2, no. 2, p. 15, 2020.

I. C. Laksmana and H. F. Satoto, “Usulan Perbaikan Fasilitas Kerja pada Produksi Parutan Kelapa Berdasarkan Hasil Evaluasi QEC dan REBA,” Prosidimh Senakama, vol. 2, pp. 137–162, 2023.

Y. Hutabarat, DASAR-DASAR PENGETAHUAN ERGONOMI, vol. 1. 2017.

M. Khotib and H. F. Satoto, “PERANCANGAN ALAT PEMBENTUK PASAK PERAHU DENGAN PENDEKATAN ERGONOMI GUNA MENINGKATKAN PRODUKTIVITAS DAN MENURUNKAN KELELAHAN KERJA,” TEKNIKA, vol. 1, no. 1, pp. 164–172, 2023.

Tarwaka, S. H. Bakri, and L. Sudiajeng, Perpustakaan Nasional: Katalog dalam terbitan (KDT) Tarwaka, vol. 1. 2004.

C. F. Hasibuan, S. Munte, and S. B. Lubis, “Analisis Pengukuran Beban Kerja dengan Menggunakan Cardiovascular Load (CVL) pada PT. XYZ,” JOURNAL OF INDUSTRIAL AND MANUFACTURE ENGINEERING, vol. 5, no. 1, pp. 65–71, May 2021, doi: 10.31289/jime.v5i1.5054.

Downloads

Abstract Views : 37
Downloads Count: 26

Published

2024-06-09

How to Cite

Basri, M. S., & Satoto, H. F. (2024). PENGUKURAN KELELAHAN KERJA DAN EVALUASI POSTUR KERJA PADA PEKERJA PELONGGARAN GARAM. J-ENSITEC (Journal of Engineering and Sustainable Technology), 10(02), 1056–1063. https://doi.org/10.31949/jensitec.v10i02.9287

Issue

Section

Articles