CV. XYZ is a distributor of building materials but focuses on PVC pipe products under the Target brand. CV. XYZ was founded in 2013. At CV. XYZ is very necessary for inventory scheduling which needs to be carried out by CV. XYZ in order to always meet consumer demand. The author suggests inventory calculations and scheduling to meet consumer demand using the Distribution Requirement Planning (DRP) method. In the DRP method there are several stages of data needed, namely demand data, inventory, lead time, holding cost data. Data processing in this DRP method is demand forecasting, determining Lead Time, determining lot size, calculating safety stock, and creating DRP tables. In the calculation results, results were obtained for distribution costs for 5 pipe products which initially had excess stock and could not meet demand. For Target Pipe AW 1.0 x 4m products savings of 33%, Target Pipe AW 2 ½ x 4m savings of 67%, Target Pipe C 5/8 x 4m savings of 67%, Target Pipe D 1 ½ savings of 50%, Target Pipe D 6.0 x 4m savings of 67%.

 

Keywords:

Distribution requirement planning, schedulling

Downloads

Download data is not yet available.

References

HIDAYATULLAH, H. (2018). ANALISA SISTEM DISTRIBUSI PRODUK ALAT PENGEBORAN VALVE UNTUK WILAYAH KARAWANG DENGAN METODE DISTRIBUTION RESOURCES PLANNING (DRP).

MAHENDRA, R. (2019). PERENCANAAN DAN PENGENDALIAN BAHAN BAKU MENGGUNAKAN METODE MATERIAL REQUIREMENT PLANNING ( Studi Kasus Di PT. Cahaya Murni Andalas Permai ). Retrieved from https://ecampus.sttind.ac.id/sttind/AmbilLampiran?ref=2685&jurusan=&jenis=Item&usingId=false&download=false&clazz=ais.database.model.file.LampiranLain

Martono, R. (2015). MANAJEMEN LOGISTIK TERINTEGRASI. (Retnowati, Ed.) Penerbit PPM.

Martono, R. V. (2018). MANAJEMEN LOGISTIK. PT Gramedia Pustaka Utama, Jakarta.

Nugraha Kusuma Ningrat, E. A. (2023). PENERAPAN METODE DISTRIBUTION REQUIREMENT PLANNING (DRP) DALAM PENJADWALAN DISTRIBUSI PRODUK DI UKM SB JAYA CIAMIS. JURNAL INDUSTRIAL GALUH.

Nuraeni. (2021). IMPLEMENTASI METODE DISTRIBUTION REQUIREMENTS PLANNING (DRP) PADA PRODUK SARDEN AYAM BRAND CV. SURYA MEGAH PERKASA DI MAKASSAR.

Pujawan, I. N. (2010). Supply Chain Management. (I. k. Gunarta, Ed.) Guna Widya.

WICAKSONO, R. (2023). ANALISA DISTRIBUSI PRODUK DENGAN MENGGUNAKAN METODE DISTRIBUTION REQUIREMENT PLANNING DI CV. JAGO NIAGA SEMESTA.

Downloads

Abstract Views : 42
Downloads Count: 18

Published

2024-06-09

How to Cite

Putri Ma’arif, D. E., & Abdulrahim, M. (2024). EVALUASI PRODUKSI DAN PERSEDIAAN PADA PRODUK PIPA DI CV.XYZ. J-ENSITEC (Journal of Engineering and Sustainable Technology), 10(02), 1049–1055. https://doi.org/10.31949/jensitec.v10i02.9272

Issue

Section

Articles