Optimalisasi Sistem Penjadwalan Produksi Untuk Meminimalisir Keterlambatan Produksi Di PT Fahifa Prima Mandiri
DOI:
https://doi.org/10.31949/jensitec.v9i02.3969Abstrak
During the production process activities to get the best results, the production process activities need to be well planned. Production scheduling is one way to plan the activities of the production process. This research took place at PT Fahifa Prima Mandiri, at the time of direct research there were Lateness in meeting product requests from consumers. The purpose of this research is to optimize the scheduling of the production scheduling system used by the company by using the SPT, LPT, and EDD methods to minimize Lateness. FCFS is the method used by the company with a total Lateness of 65 days and an average Lateness of 9 days, the SPT method with a total Lateness of 51 days and an average Lateness of 7 days, the LPT method with a total Lateness of 89 days and an average Lateness 13 days, the EDD method with a total Lateness of 53 days and an average Lateness of 8 days. From the results of the calculation of several methods used the SPT method is the optimal method used, with the application of this method so that the production process at the company can be maximized.
Unduhan
Referensi
Annisya, Shita Dwi, and Joumil Aidil Saifudin. 2020. “Analisis Penjadwalan Produksi Batu Tahan Api Dengan Menggunakan Metode Campbell Dudek Smith (Cds), Nawaz Enscore Ham (Neh), Dan Palmer Untuk Mengurangi Makespan Di Pt. X.” Juminten 1(3): 165–76.
Bagus, Ida, Putra Manuaba, and S Kom. 2013. “Sistem Penjadwalan Produksi Menggunakan Metode Fuzzy Support Vector Machines Dan Algoritma Evolusi Fuzzy.” Smart-Green Technology in Electrical and Information System (November): 14–15.
Barry, Haizer Jay & Render. 2005. Operations Management. jakarta: Salemba Empat.
Faccio, Maurizio, Mojtaba Nedaei, and Francesco Pilati. 2018. “A Comparative Analysis of Job Scheduling for Optimum Performance of Parallel Machines by Considering the Energy Consumption.” European Journal of Engineering Research and Science 3(9): 6.
Fadli, Mohamad Rizal, and Wiwik Sulistiyowati. 2019. “Optimalisasi Penjadwalan Produksi Pipa Di Line 18 Dengan Metode First Come First Serve (Fcfs) , Earlier Due Date (Edd) , Short Process Time (Spt) (Studi Kasus : Pt Wtur).” Jurnal Prozima 3(2): 44–54.
Kurnia, Refdilzon Yasra, and Vera Methalina Afma. 2013. “Penjadwalan Produksi Dengan Menggunakanmetode Campbell, Dudek & Smith Pada Mesin Lasermarking Jenis Evertechuntuk Meminimalisasimakespan.” 1(2): 93–103.
Kurniawati, Dwi Agustina, and Muchammad Syafii Karim. 2016. “Penjadwalan Produksi Flowshop Dengan Metode Ignall-Scharge Dan Di CV . Bestone Indonesia.” Jurnal Sains, Teknologi dan Industri 13(2): 229–41.
Mulyati, Erna, Irpan Numang, and Muchamad Aditya Nurdiansyah. 2020. “Usulan Tata Letak Gudang Dengan Metode Shared Storage Di PT Agility International Customer PT Herbalife Indonesia.” Jurnal Logistik Bisnis 10(02): 36–41.
Nursanti, Ida, and Febriana Musfiroh. 2018. “Penerapan Lean Warehouse Pada Gudang Produk Jadi Cv. Bumi Makmur, Karang Tengah, Wonogiri Untuk Meminimasi Pemborosan.” Jurnal Ilmiah Teknik Industri 5(2): 129–38.
Rudyanto, Agus, and Moch Arifin. 2010. “Penerapan Metode Earliest Due Date Pada Penjadwalan Produksi Paving Pada Cv. Eko Joyo.” Seminar Nasional Aplikasi Teknologi Informasi 2010(Snati): 1907–5022.
Safitri, Rosi Indah. 2019. “Analisis Sistem Penjadwalan Produksi Berdasarkan Pesanan Pelanggan Dengan Metode FCFS, LPT, SPT Dan EDD Pada PD. X.” Jurnal Optimasi Teknik Industri (JOTI) 1(2): 26.
Sanjaya, Danang. 2020. “Penjadwalan Produksi Anyaman Bambu Dengan Menggunakan Metode Shortest Processing Time ( Spt ) Pada Ikm Anyaman Bambu Gunung Tajem.” Mahasiswa Industri Galuh 1(1): 139–46.
Saputra, Destryan Dyah. 2020. “Usulan Penerapan Theory of Constraints Guna Mengoptimalkan Kapasitas Produksi Pada PT XYZ.” Scientifict Journal of Industrial Engineering 1(2): 7–11.
Subroto, W, and T Herdi. 2019. “Sistem Pendukung Keputusan Dalam Menentukan Prioritas Penjadwalan Produksi Menggunakan Metode Edd (Earliest Due Date) Dan Spt (Shortest Processing Time) Pada Industri Farmasi.” Jurnal Sistem Informasi dan E-Bisnis 1(2): 39–48. https://jurnal.ikhafi.or.id/index.php/jusibi/article/view/69.
Diterbitkan
Cara Mengutip
Terbitan
Bagian
Lisensi
Hak Cipta (c) 2023 Dwiky fadillah

Artikel ini berlisensiCreative Commons Attribution-ShareAlike 4.0 International License.
An author who publishes in the J-ENSITEC (Journal of Engineering and Sustainable Technology) agrees to the following terms:
- Author retains the copyright and grants the journal the right of first publication of the work simultaneously licensed under the Creative Commons Attribution-ShareAlike 4.0 License that allows others to share the work with an acknowledgment of the work's authorship and initial publication in this journal
- The author is able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book) with the acknowledgment of its initial publication in this journal.
- The author is permitted and encouraged to post his/her work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of the published work