ARIEF RIJALUDDIN. STUDI EVALUASI PENGENDALIAN BIAYA (COST CONTROL) DAN JADWAL PELAKSANAAN (SCHEDULING) PADA PROYEK PEMBANGUNAN GEDUNG RAWAT JALAN DAN BASSEMENT RSUD MAJALENGKA MENGGUNAKAN METODE EARNED VALUE DAN SOFTWARE MS. PROJECT : Indonesia. J-ENSITEC (Journal of Engineering and Sustainable Technology), [S. l.], v. 8, n. 01, p. 611–618, 2022. DOI: 10.31949/jensitec.v8i01.1910. Disponível em: https://ejournal.unma.ac.id/index.php/j-ensitec/article/view/1910. Acesso em: 8 sep. 2024.