Arief Rijaluddin 2022. STUDI EVALUASI PENGENDALIAN BIAYA (COST CONTROL) DAN JADWAL PELAKSANAAN (SCHEDULING) PADA PROYEK PEMBANGUNAN GEDUNG RAWAT JALAN DAN BASSEMENT RSUD MAJALENGKA MENGGUNAKAN METODE EARNED VALUE DAN SOFTWARE MS. PROJECT : Indonesia. J-ENSITEC (Journal of Engineering and Sustainable Technology). 8, 01 (Jan. 2022), 611–618. DOI:https://doi.org/10.31949/jensitec.v8i01.1910.